|
7:00 AM
|
Continental Breakfast
|
Omni La Mansion - San Antonio, TX
El Cabildo Foyer
|
|
8:00 AM
|
Welcome / Opening Remarks / Lean Think / Energy Footprint
|
EJ Burke / Dyno & J Heinemann / Sandvik
Iberian B & C - 5th Floor
|
|
8:45 AM
|
Lean Thinking Applied to the Quarry Process (100)
|
J Caldwell / Southwest Research
Iberian B & C - 5th Floor
|
|
9:45 AM
|
Break
|
El Cabildo Foyer
|
|
10:15 AM
|
"Making the Right Stuff": Screening and Sizing (101)
|
G Schlemmer / Sandvik
Iberian B & C - 5th Floor
|
|
11:00 AM
|
Crushing - Principles of Mechanical Crushing (102)
|
P Svedensten / Sandvik
Iberian B & C - 5th Floor
|
|
12:00 PM
|
Lunch
|
Madero - 5th Floor
|
|
1:00 PM
|
Getting Control for Optimal Plant Performance: Advanced Crushing (103) |
A Scott / Sandvik
Iberian B & C - 5th Floor
|
|
2:00 PM
|
Optimizing the "Crunch" Process: More Crushing (104) |
P Svedensten / Sandvik
Iberian B & C - 5th Floor
|
|
2:30 PM
|
Break
|
El Cabildo Foyer
|
|
3:00 PM
|
Putting the Plant Together (120)
Group A Must Attend this Workshop
|
C Hillmann & P Svedensten / Sandvik
Iberian B & C - 5th Floor
|
|
Group B Workshop Choices
|
Plant Design Do's and Don'ts (121)
|
A Scott / Sandvik - Veramendi
|
|
|
Loader Operator Simulator (122)
|
W Turlington/Volvo-Madero Prefunction
|
|
|
Principles of Screening and Sizing (123)
|
G Schlemmer / Sandvik - Iberian A
|
|
|
Drill Simulator (124)
|
A Martin/ Sandvik - El Cabildo Foyer
|
|
4:00 PM
|
Break
|
El Cabildo Foyer
|
|
4:10 PM
|
Putting the Plant Together (120)
Group B Must Attend this Workshop
|
C Hillmann & P Svedensten / Sandvik
Iberian B & C - 5th Floor
|
|
Group A Workshop Choices
|
Plant Design Do's and Don'ts (121)
|
A Scott / Sandvik - Veramendi
|
|
|
Loader Operator Simulator (122)
|
W Turlington/Volvo-Madero Prefunction
|
|
|
Principles of Screening and Sizing (123)
|
G Schlemmer / Sandvik - Iberian A
|
|
|
Drill Simulator (124)
|
A Martin/ Sandvik - El Cabildo Foyer
|
|
5:10 PM
|
Free Time
|
|
|
6:00 PM
|
Reception
|
Madero - 5th Floor
|
|
6:30 PM
|
Dinner
|
Madero - 5th Floor
|
|
7:30 PM
|
Keynote Address: "Countdown To Safety"
|
Astronaut Mike Mullane
Madero - 5th Floor
|
|
6:00 AM
|
Continental Breakfast
|
El Cabildo Foyer
|
|
7:30 AM
|
Plant / Crushing Automation (200)
|
C Hillmann / Sandvik
Iberian B & C - 5th Floor
|
|
8:20 AM
|
Haul & Load - Improving Existing Operations (201)
|
D Nus & D Reeves / Volvo
Iberian B & C - 5th Floor
|
|
9:20 AM
|
Break
|
D Nus & D Reeves / Volvo
Iberian B & C - 5th Floor
|
|
9:50 AM
|
Haul & Load - The Big Picture for Future Operations (202)
|
D Nus & D Reeves / Volvo
Iberian B & C - 5th Floor
|
|
10:20 AM
|
Off Road Tires for Quarry Applications (203)
|
J Van Orsdel / Bridgestone
Iberian B & C - 5th Floor
|
|
11:05 AM
|
Break
|
El Cabildo Foyer
|
|
11:35 AM
|
Orientation to Quarry Briefing
|
Mardero - 5th Floor
|
|
12:30 PM
|
Assemble / Load Buses / Pickup Box Lunch
|
College Street - North Side of Hotel
|
|
12:45 PM
|
Buses Leave for Quarry
|
College Street - North Side of Hotel
|
1:30 PM
20 Min. each Station
|
Field Workshops - Rotating Stations
|
CEMEX Quarry - Tented Stations
|
|
|
Surveying - Drill Hole and Drill Bench
|
B Hissem / Sandvik & S Brashear / Dyno
|
|
|
Blast Gradation Analysis
|
S Giltner / Dyno
|
|
|
Electronic Initiation Systems
|
S Tavelli & B Hostetler / Dyno
|
|
2:30 PM
|
Electronic Timing Field Demonstration
|
Entire Group with S Tavelli / Dyno
|
|
3:00 PM
|
Class Photo in the Field
|
Entire Group with J Anderson / Dyno
|
|
3:10 PM
|
Load Buses - Drive to Primary Crusher Feeder Site
Walk down beside the HSI Primary Crusher
View the new Screen / Stacker System
|
Entire Group
|
|
4:20 PM
|
Load Buses - Drive to Hotel
|
Entire Group
|
|
5:15 PM
|
Free Time
|
|
|
6:10 PM
|
Dinner in Sub-Groups
|
Riverwalk Area
|
|
6:30 AM
|
Continental Breakfast
|
El Cabildo Foyer
|
|
7:30 AM
|
A Reality Check: A Legal Perspective on
Blasting Risk Management (300)
|
S Brashear / Dyno
M Bowling & J Friedman/Friedman Leak
Iberian B & C - 5th Floor
|
|
8:45 AM
|
The Chemical Crusher: Drilling & Blasting (301)
|
L Mirabelli / Dyno & B Hissem / Sandvik
Iberian B & C - 5th Floor
|
|
9:35 AM
|
Break
|
El Cabildo Foyer
|
|
10:05 AM
|
Blasting Vibration Control: Take Control,
Not Grief (302)
|
S Brashear / Dyno
Iberian B & C - 5th Floor
|
|
10:35 AM
|
Best in the Blast: Fragmentation
Management (303)
|
S Giltner / Dyno
Iberian B & C - 5th Floor
|
|
11:20 AM
|
The Modern Miracle of Rock Drilling
Applications & Selection Issues (Part 1) (304)
|
A Lislerud / Sandvik
Iberian B & C - 5th Floor
|
|
12:00 PM
|
Current / Future State Questions
|
EJ Burke / Dyno
Iberian B & C - 5th Floor
|
|
12:10 PM
|
Lunch
|
Madero - 5th Floor
|
|
1:00 PM
|
The Modern Miracle of Rock Drilling
Applications & Selection Issues (Part 2) (304)
|
A Lislerud / Sandvik
Iberian B & C - 5th Floor
|
|
1:30 PM
|
Linking the Full Value Chain (320)
Group A Must Attend this Workshop
|
S Giltner / Dyno & C Hillmann / Sandvik
Iberian B & C - 5th Floor
|
|
Group B Workshop Choices
|
Modern Blast Vibration Control (321)
|
S Brashear / Dyno - Iberian A
|
|
|
Drill Time & Drill Cost Study (322)
|
B Hissem / Sandvik - Veramendi
|
|
|
Drill / Blast Controls Workshop (323)
|
A Lislerud / Sandvik - Madero
|
|
|
Loader / Haul Truck Simulator (324)
Drill Simulator (325)
|
W Turlington/Volvo-Madero Prefunction
A Martin/ Sandvik - El Cabildo Foyer
|
|
2:30 PM
|
Break
|
El Cabildo Foyer
|
|
2:40 PM
|
Linking the Full Value Chain (320)
Group B Must Attend this Workshop
|
S Giltner / Dyno & C Hillmann / Sandvik
Iberian B & C - 5th Floor
|
|
Group A Workshop Choices
|
Modern Blast Vibration Control (321)
|
S Brashear / Dyno - Iberian A
|
|
|
Drill Time & Drill Cost Study (322)
|
B Hissem / Sandvik - Veramendi
|
|
|
Drill / Blast Controls Workshop (323)
|
A Lislerud / Sandvik - Madero
|
|
|
Loader / Haul Truck Simulator (324)
|
W Turlington/Volvo-Madero Prefunction
|
|
|
Drill Simulator (325)
|
A Martin/ Sandvik - El Cabildo Foyer
|
|
3:40 PM
|
Wrap Up And Closing
|
Iberian B & C - 5th Floor
|
|
4:00 PM
|
Safe Travels
|
|